The brief
A 240-flat society in Kothrud wanted residents off slow copper broadband, without new cables running down the building's face.
What we did
- Installed concealed fibre risers in each wing's service shaft
- Fitted a lockable distribution box on every floor
- Ran an on-site sign-up camp with the society committee
Result
Over 150 flats connected in the first two weeks, with the remaining wiring in place for anyone who joins later.